However two basic input to RMC viz Cement and Fly ash are received at site in Bulkers or in bags. The optimum productivity of Batching plant depends on how fast the cement / fly ash received at kite is transferred to Batching Silo.
Techx has designed, manufactured and supplied user friendly system mounted on a skid, It will have options to both modes of Cement / fly ash input i.e. Loose in Bulkers or material received in Bags.
Conveying from Bulker to Main Silo is achieved by diverting the voluminous air flow at around 1 Kg /Cm2 Pressure. The bulker is aerated and pressurized.
Opening of Bottom Valve allows cement / fly ash to fall directly in dispatch pipe. The air flow carries the material to the main Silo. The conveying rate achieved is 30 - 32 Tons I Hour for this mode, the power consumed is 45 HP.
When cement 1 fly ash is received at site in Bags, then they are manually taken to a hopper. Bags are slit and loose material dumped in to the hopper. A specially, designed rotary valve ensures measured flow of material in to the discharge pipe line. It also prevents air entering the hopper. The cement / fly ash dropped in discharge pipe is pushed ahead to main silo with the pressure of 1 Kg/Cm2. The transfer rate achieved is 12 to 15 Tons / Hour for this mode. The power consumed is 45 HP. |